Development is underway at Frasers Tower in Singapore with many offices being snapped up by major worldwide companies.
Shiseido, the Japanese cosmetics group have taken up 50,000 sq ft, Arup engineering and environmental consultancy company have taken up 40,000 sq ft, Microsoft have taken up 125,000 sq ft and French energy giant, Total have leased over 100,00 sq ft at the Tower in Singapore.
The Genesis stair nosing, NHD24 has been specified to be used on all stair cases within the Total Oil floors. NHD24 is a rakeback nosing that provides excellent slip resistance whilst looking smart and stylish.
If you would like to receive updates and the latest news of our product launches